Monday, January 31, 2005

Piling up

Image Hosted by ImageShack.us
Over the weekend we concentrated a bit more on choosing carpet and paint.

Image Hosted by ImageShack.us
After a bit of arguing and ocular-sensory-overload, we made a decision. Monday morning the choices still looked good, so I think we are good there.

We also added to the things sitting around the house waiting to be used.

Image Hosted by ImageShack.us
Our new mattress was delivered.

Image Hosted by ImageShack.us
We picked up the skylights (which will not be installed until spring, when the shingles aren't so brittle).

Image Hosted by ImageShack.us
These items joined stuff already waiting. The air conditioner,

Image Hosted by ImageShack.us
the stroller,

Image Hosted by ImageShack.us
and a whole lotta baby stuff from various friends and family.

2 Comments:

Anonymous Anonymous said...

hmm. wonder what that mattress will be like. i had to deliver one to the third floor of an apartment building with no elevator when i was running packages for UPS this past Xmas. that mattress was not fun...

Sean

9:26 AM  
Blogger Aaron said...

that mattress was not fun...It will be once we get it set-up! (rim-shot)

I can imagine it not being much fun. The light box is big, and the small box is heavy. I was surprised that this is the one we ended up getting. It turned out to be not much more expensive than a decent inner-coil/box-spring set. The price difference will more than be made up when it comes time to take it upstairs. Getting it to the third floor may have been a pain, but imagine trying to squeeze a king mattress and split box-spring up the stairway of a one-and-a-half-story south Minneapolis home.

12:37 PM  

Post a Comment

<< Home